One Cluster II spacecraft in Payload Processing Facility clean
room. June 2000.
|

Thermal blanket installation on FM6. 15 June 2000.
|

Hoisting FM7 on top of FM6 spacecraft. 24 June 2000.
|

Tensioning the clamp band. 24 June 2000.
|

Tilting the upper composite into horizontal position
for encapsulation into the fairing. 2 July 2000.
|

Fairing encapsulation. 11 July 2000.
|

Final assembly of Soyuz rocket and Cluster II. 12 July 2000.
|

Soyuz/Cluster II installation onto launch pad. 13 July 2000.
|

Soyuz/Cluster II on launch pad. 13 July 2000.
|

Just before lift-off. 16 July 2000
|

Ignition. 16 July 2000.
|

Lift-off. 16 July 2000.
|

Lift-off. 16 July 2000.
|

Lift-off. 16 July 2000.
|